CD-ROM
ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU KAYU PADA UD RAHMA
ABSTRAK
The purpose of this study is to find out and analyze the optimal number of puchases each. Time making and order, knowing the safety stok raw materials that must be provided and knowing when to re-order raw materials.this type of research is quantitative descriptif research, using the EOQ ( Economic Order Quantity) method. The result of this study indicate that when using the EOQ method the economical raw material purchase in 2017 is 63,67 m3. With the order frequency of 9,14 time and the optimum cycle time of each order is 31,1 days. The number of safety suppies that must be povided is 7.113,6 m3. The right time to re-order is when the raw material supply is 7.121,08 m3.
keywords: Economic Order Quantity, Safety Stock, Reorder Point.
ABSTRAK
Tujuan penelitian ini adalah untuk mengetahui dan menganalisis jumlah pembelian yang optimal setiap kali melakukan pemesanan, mengetahui persediaan pengaman bahan baku yang harus disediakan dan mengetahui kapan akan dilakukan pemesanan kembali bahan baku. Jenis penelitian ini merupakan penelitian deskriptif kuantitatif, yaitu dengan menggunakan metode EOQ (Economic Order Quantity). Hasil penelitian ini menunjukan bahwa apabila menggunakan metode EOQ pembelian bahan baku yang ekonomis tahun 2017 adalah 63,67 m3 dengan frekuensi pemesanan sebanyak 9,14 kali dan waktu siklus optimum setiap pemesanan adalah 31,1 hari. Jumlah persediaan pengaman yang harus disediakan adalah 7.113,6 m3. Waktu yang tepat untuk mengadakan pemesanan kembali adalah pada saat persediaan bahan baku sebesar 7.121,08 m3.
Kata Kunci: Economic Order Quantity, Persediaan Pengaman, Titik Pemesanan Kembali.
Tidak tersedia versi lain